Primary or Improved Reservoir Recovery

(1) BitCan designs sand control and sand management, including Cold Heavy Oil Production Process (CHOP). We can simulate reservoir compaction as well as subsidence and casing deformation.
(2) Our in-situ stress engineering technology can guide design flooding operation and hydraulic re-fracturing. We start with the concept of whole reservoir development and aim to maximize reservoir contact and place stimulants optimally.